Numerous projects at the studios in Leavesden since 2019 including the extension to the Harry Potter Tour and the construction of many new stages.
A huge proportion of the works were high level hanging beamed boarded decks in excess of 1000m² to provide safe access for sound proofing and ductwork. All stages and adjoining office blocks had progressive independent access scaffold for brickwork/blockwork including numerous loading bays and access stairs.
The speed in which these projects were completed was always high priority but never failing on safety first.